Project overview

PTS Consulting was engaged by the Colocation Provider as part of the MEP delivery team to provide consultancy and design services for the refurbishment of the Colocation Provider in London Docklands.

Originally constructed in the early 1990s, the facility was acquired and refurbished to integrate into the client’s wider co-location data centre portfolio. The redevelopment was designed to deliver six floors of data hall space, each providing 2.7 MW of power capacity and supporting approximately 667 racks per floor.

PTS was appointed to support phases one and two of the programme, delivering AV & Multimedia and Passive IT Infrastructure consultancy from concept design through to construction administration

AdobeStock 1753546543 scaled uai

Client Requirements

The client required a resilient and future ready infrastructure platform aligned with operational standards across its wider data centre estate.

A key challenge was modernisingan existing facility while integrating new systems into a live operational environment. The refurbishment also required high levels of resilience, diverse connectivity and scalable infrastructure capable of supporting critical operational systems.

In parallel, the project required upgraded AV environments including a new Building Control Room and Situation Room to support operational monitoring and incident management

Our Approach

PTS delivered consultancy and technical design services across RIBA Stages 1 to 5, supporting the project from concept and spatial design through to construction administration.

Working closely with the Colocation Provider and the wider delivery team, PTS designed equipment rooms, structured cabling systems and containment infrastructure to support corporate LAN, Wi-Fi and critical operational systems including security and building management platforms.

For Passive IT Infrastructure, PTS developed resilient connectivity strategies and equipment room layouts designed to support operational continuity and future scalability across the refurbished facility.

PTS also delivered the AV & Multimedia strategy for a range of operational and collaboration spaces. This included meeting rooms, digital signage systems and the design of a new Building Control Room and associated Situation Room.

The upgraded AV environment replaced outdated legacy systems and aligned operational capabilities with those being deployed across the client’s wider Docklands campus.

Throughout the programme, PTS coordinated closely with project stakeholders to ensure all systems aligned with the client’s operational and technical requirements.

Outcomes and benefits

The project establishes a future ready infrastructure platform aligned to the client’s global operational standards. 

Key Outcomes

  • Resilient infrastructure supporting critical operational systems
  • Modernised AV environments improving operational visibility and coordination
  • Scalable Passive IT Infrastructure supporting future growth
  • Improved Building Control Room capabilities aligned with wider campus standards
  • Enhanced operational readiness through integrated infrastructure and AV systems

PTS enabled the successful refurbishment and modernisation of a major London co-location data centre facility.

At a Glance

Major London co-location data centre refurbished and modernised

Integrated infrastructure and AV systems aligned with wider campus standards